Freight Car Truck Design Optimization. Introduction and Detailed Test Plans--Series 1, 2, and 3 Tests--Phase I.

This report has yet to be scanned by Contrails staff

Report Number: FRA-OR&D 75-59
Corporate Author(s): Southern Pacific Transportation Company
Date of Publication: 1975-11
Pages: 120
Contract: DOT FR-40023
DoD Task:
PB Number: PB248632
Identifier: PB248632

Abstract:
This document serves as an introduction to the Freight Car Truck Design Optimization Project (TDOP) and presents the detailed test plans for Series 1, 2, and 3 Tests of a contemplated group of four series for that project. Some of the background of the project is given, the development of the test method is described, a description of the instrumentation on the test track and test car and of the facilities of the Southern Pacific Transportation Co, (SPT Co.) are given, a data collection and processing plan and analytical procedures for comparing test results with predicted values are presented. A description of the Series 1, 2, and 3 Tests, the contemplated test schedule, and the management structure for the project are also given. In the appendix, the tasks required to be performed by the statement of work for the Phase I are outlined.

Provenance: S. Kumar

Other options for obtaining this report:

Via the Defense Technical Information Center (DTIC):
A record for this report, and possibly a pdf download of the report, exists at DTIC

Via National Technical Report Library:
The NTRL Order Number for this report is: PB248632
A record for this report, and possibly a pdf download of the report, exists at NTRL

Indications of Public Availability
A PB Number, PB248632 , exists for this report, indicating public availability of the report at time of publication

No digital image of an index entry indicating public availability is currently available
There has been no verification of an indication of public availability from an inside cover statement



Export