Aerial Structure and Rail Support Methods
This report has yet to be scanned by Contrails staff
Author(s):
Parsons Brinkerhoff-Tudor-Bechtel
Corporate Author(s): Parsons Brinckerhoff-Tudor-Bechtel
Corporate Report Number: TR-11
Date of Publication: 1966
Pages: 36
DoD Task:
PB Number: PB177496
Identifier: PB177496
Abstract:
Kaiser Engineers, as consultants to Parsons Brinckerhoff-Tudor-Bechtel (PBTB), conducted studies of rail fasteners. The purpose of these investigations was to evaluate the fastener hardware available and to recommend types or systems for installation and testing of the Diablo Test Track. As a result of the studies six types of fastener were selected for further evaluation at the test track.
Provenance: S. Kumar
Corporate Author(s): Parsons Brinckerhoff-Tudor-Bechtel
Corporate Report Number: TR-11
Date of Publication: 1966
Pages: 36
DoD Task:
PB Number: PB177496
Identifier: PB177496
Abstract:
Kaiser Engineers, as consultants to Parsons Brinckerhoff-Tudor-Bechtel (PBTB), conducted studies of rail fasteners. The purpose of these investigations was to evaluate the fastener hardware available and to recommend types or systems for installation and testing of the Diablo Test Track. As a result of the studies six types of fastener were selected for further evaluation at the test track.
Provenance: S. Kumar